MORE THAN 80 YEARS BUILDING

2.1.1 Areas of Business Railways

HIGH SPEED

Madrid – Barcelona - French frontier high speed line platform, Trinidad node - Montcada section. ADIF

North - north-west high speed line platform. Valladolid - Palencia connection, Venta de Baños node sub-section. ADIF

Madrid - Galicia high speed line platform, Ponte Ambía - Taboadela section. ADIF

Vitoria – Bilbao - San Sebastián high speed line platform, Durango - Amorebieta/Etxano section (Vizcaya). ADIF

Antequera - Granada high speed line platform, Bobadilla node - Antequera section. ADIF

Castellbisbal/Papiol - Mollet Sant Fost branch, implementation of third rail. Ministry for Development, DGIF

Eastern Spain high speed line platform, Albacete - Alpera bypass section, phase II. ADIF

Atlantic axis high speed platform, Das Maceiras - Redondela section (Pontevedra). Ministry for Development, DGIF

Eastern Spain high speed line platform, Montforte del Cid - Aspe section. ADIF

Eastern Spain high speed line platform, Valencia arterial railway system section, access channel phase I. ADIF

Track renovation, eastern Spain high speed line installation phase, Albacete - Almansa section. ADIF

NAFAV track laying, eastern Spain, Madrid - Castile La Mancha - Region of Valencia -Region of Murcia, Xátiva – Almussafes section. ADIF

Dual gauge changeover in eastern header of Albacete station. ADIF

IBERIAN GAUGE

Track renovation, modernising of catenary and complementary work. Tarragona - Barcelona - France line, Granollers - Massanet section. Ministry for Development, DGIF

Andalusian transverse axis railway platform, Osuna bypass section (Seville). Government of Andalusia, Andalusian Railways

Track laying, Madrid suburban line C-3, 3rd and 4th tracks between Getafe Industrial and Pinto, integration of railway in Pinto. Cercanías Pinto UTE

METRIC GAUGE, METROS AND TRAMWAYS

Building work on Loiola - Herrera section, Lasarte – Hendaye line. ETS

Superstructure (track and catenary), new southern terminal section Prat – northern enlargement of line 9, Barcelona Metro. Government of Catalonia, GISA

Infrastructure, superstructure, electrification, signalling, control and communications, line T2, Valencia Metro, Avda Hermanos Maristas - Nazaret section. Government of Valencia, Public Works General Directorate

Accessibility improvement, Virrei Amat station on line 5 of FMB. Government of Catalonia, GISA

Removal of level crossings C-8 and C-9 at km 55+478 and 56+060, respectively, Valencia - Villanueva de Castellón FGV line in Carlet. Government of Valencia, Public Works General Directorate

Tramway platform, Seville light metro, Pardo S Sebastián - San Bernardo railway station section. Seville City Council

Building work on Vitoria tramway, Abetxuko branch, phase 2. ETS

Renovation of linings, line 2. Madrid Metro

Track renovation Ramal Ópera - Príncipe Pío. Madrid Metro

INTERNATIONAL

Mondego Metro, renovation of Alto de S Joao - Miranda do Corvo section. Refer

Northern line, Coimbra B station, renovation of tracks A and D. Refer